Skip to main content
Civil Engineering & Construction

Server Room and Data Centre Construction

Purpose-built rooms for servers and network equipment, with cooling, power, fire protection and secure access.

About Server Room and Data Centre Construction

Server Room and Data Centre Construction

A server room must stay cool, powered and protected. We build or convert rooms with raised floors or racks, air conditioning, clean power with UPS and generator connection, fire detection and suppression, and controlled access, scaled to the number of racks you need.

What we do

  • Room design with rack layout and cable routes
  • Walls, ceilings, flooring and sealing against dust
  • Cooling system installation
  • Electrical distribution, UPS and generator connection
  • Fire detection and suppression
  • Access control, CCTV and environmental monitoring

What we need from you to quote

  • Number of racks and equipment to be housed now and in future
  • Available room or building plan
  • Electrical capacity and generator availability
  • Cooling preferences and local climate
  • Compliance or insurance requirements for your sector
  • Downtime tolerance and migration plan
Related

More in Civil Engineering & Construction

Solar Power Systems Construction

Solar panel, inverter and battery systems for homes, farms, schools, clinics and commercial buildings, designed around the actual load.

Have a project in mind?

Send your scope, drawings or a bill of quantities and our engineers will respond with a clear proposal.

CallQuote