
Testing & Commissioning
Systematic testing and start-up of installed systems to prove they work as designed.

We run pre-commissioning checks, functional and performance tests and adjust settings, recording results. The system is then demonstrated to you and accepted.
What we do
- Pre-commissioning inspection checklists
- Functional and performance tests
- Adjustment and configuration of settings
- Recording of test results
- Demonstration to client
- Snag list and close-out
What we need from you to quote
- Specification or acceptance criteria
- Access to the installed system
- Power and other utilities available
- Client or consultant witnesses
- Test procedures required
- Preferred dates
